State Route 104 both directions in Gibson County - Between SR-188 (HWY.188) RT. & (RIVERSIDE-YORKVILLE RD.) LT. and SR-457 RT., a widening project will temporarily slow traffic every day. This work is expected to be completed by 8/31/2014.
|
|
|
State Route 76 both directions in Fayette County - Between SR-57 (STATE HWY.59) RT. & LT. / BEGIN STATE HWY.76 / {IN MOSCOW} and SR-193 (MACON RD. DR.) LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 11/30/2013.
|
|
|
State Route 57 both directions in Fayette County - Between SR-196 (CHULAHOMA RD.) RT. & LT. and SR-194 (MAIN ST.) LT., construction work will result in a lane shift every day. This work is expected to be completed by 3/31/2013.
|
|
|
State Route 224 both directions in McNairy County - Between SR-199 (FINGER-LEAPWOOD RD.) LT. / (BEGIN LEAPWOOD-ENVILLE RD.) and MCNAIRY-CHESTER COUNTY LINE, bridge replacement construction will result in lane closures every day. This work is expected to be completed by 5/15/2013.
|
|
|
Interstate 55 both directions in Shelby County - Between EXIT 8: HORN LAKE RD. and EXIT 10: S. PARKWAY, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 06/30/2013.
|
|
|
Interstate 240 eastbound in Shelby County - Between EXIT 16: NONCONNAH PARKWAY (Mile Marker: 17) and SR-23 WALNUT GROVE RD. LT. / CENTER OF UNDERPASS, a widening project will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.
|
|
|
State Route 57 both directions in Shelby County - Between (Mile Marker: ) and (Mile Marker: ), a widening project will result in lane closures every day. This work is expected to be completed by 04/15/2013.
|
|
|
State Route 15(US-64) both directions in Hardeman County - Between (Mile Marker: ) and (Mile Marker: ), a widening project will result in a lane shift on weekdays. This work is expected to be completed by 10/31/2014.
|
|
|
State Route 194 both directions in Fayette County - Between SR-57 RT. & LT. / (BEGIN MAIN ST. / IN ROSSVILLE) and SR-59 (HWY.59) RT. & LT., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 6/30/2013.
|
|
|
State Route 224 both directions in McNairy County - Between SR-57 (HWY.57) RT. & LT. and SR-199 (FINGER-LEAPWOOD RD.) LT. / (BEGIN LEAPWOOD-ENVILLE RD.), bridge replacement construction will result in lane closures every day. This work is expected to be completed by 5/31/2013.
|
|
|
State Route 14 both directions in Shelby County - Between I-40 and SR-204 (NEW COVINGTON PK.) RT. & (SGT. WALTER K. SINGLETON PKWY.) LT., bridge repair will result in lane closures every day. This work is expected to be completed by 10/31/2012.
|
|
|
State Route 147 both directions in Benton County - Between SR-69A RT. & LT. and (Mile Marker: ), bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 4/30/2013.
|
|
|
State Route 20 both directions in Henderson County - Between LEAVE SR-104 (ADAMS ST.) RT. / PICK-UP SR-114 (NATCHEZ TRACE DR.) LT. and HENDERSON-DECATUR COUNTY LINE, a widening project will cause temporary lane closures every day. This work is expected to be completed by 10/31/2013.
|
|
|
State Route 22 both directions in Chester County - Between SR-224 (LEAPWOOD DR.) LT. and SR-100 (HWY.100) RT. & LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 5/31/2013.
|
|
|
State Route 15(US-64) both directions in Hardin County - Between SR-22 RT. and LEAVE SR-69 (MAIN ST.) RT. / {PICK-UP T0 128 (WAYNE RD. EXT.) RT.}, bridge repair will result in lane closures every day. This work is expected to be completed by 5/15/2013.
|
|
|
State Route 185 both directions in Gibson County - Between SR-5 MAIN ST. RT. & LT. and SR-54 RT. & LT., bridge repair will result in lane closures every day. This work is expected to be completed by 5/31/2013.
|
|
|
State Route 14 both directions in Shelby County - Between LEAVE SR-175 (SHELBY DR.) RT. and SR-1 (E.H. CRUMP BLVD.) RT. & LT. / {END US-61}, bridge replacement construction will close the roadway every day. This work is expected to be completed by 5/31/2014.
|
|
|
Interstate 40 westbound in Shelby County - Between EXIT 1B: US-51 / DANNY THOMAS BLVD. and ARKANSAS-TENNESSEE STATE LINE, bridge repair will temporarily slow traffic every day. This work is expected to be completed by 11/30/2013.
|
|
|
State Route 114 both directions in Hardin County - Between SR-128 CLIFTON RD. LT. and HARDIN-DECATUR COUNTY LINE, bridge repair will result in a lane shift every day. This work is expected to be completed by 10/15/2013.
|
|
|
Interstate 55 northbound in Shelby County - Between MILE MARKER 2 (Mile Marker: 2) and MILE MARKER 3 (Mile Marker: 3), construction work with no outside shoulder every day. This work is expected to be completed by 05/31/2013.
|
|
|
State Route 78 both directions in Lake County - Between SR-21 (LAKE DR.) RT. & (CHURCH ST.) LT. and SR-212 (WRAY RD.) LT., a widening project will cause temporary lane closures on weekdays. This work is expected to be completed by 5/31/2014.
|
|
|
State Route 76 both directions in Gibson County - Between SR-43 (S. FIRST ST.) RT. & LT. / (BEGIN E. VAN HOOK ST.) and SR-425 (MIDDLE ST.) LT., a widening project will cause temporary lane closures every day. This work is expected to be completed by 5/31/2013.
|
|
|
Interstate 40 both directions in Shelby County - Between ARKANSAS-TENNESSEE STATE LINE and ARKANSAS-TENNESSEE STATE LINE, bridge repair will cause temporary lane closures every day. This work is expected to be completed by 12/15/2014.
|
|
|
Interstate 40 both directions in Madison County - Between MILE MARKER 79 (Mile Marker: 79) and EXIT 79: US-412 / JACKSON, bridge repair will result in a lane shift every day. This work is expected to be completed by 6/30/2013.
|
|
|
State Route 1(US-70) both directions in Shelby County - Between I-40 CENTER OF OVERHEAD and LEAVE SR-4 (DANNY THOMAS BLVD.) LT., bridge repair will result in narrowed lanes every day. This work is expected to be completed by 6/30/2013.
|
|
|
State Route 3 both directions in Shelby County - Between SR-388 (N. WATKINS RD.) LT. and SR-385 (PAUL W. BARRET MEMORIAL PKWY.) RT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 11/15/2012.
|
|
|
State Route 14 both directions in Shelby County - Between LEAVE SR-175 (SHELBY DR.) RT. and SR-1 (E.H. CRUMP BLVD.) RT. & LT. / {END US-61}, bridge repair will result in lane closures every day. This work is expected to be completed by 11/15/2012.
|
|
|
State Route 384 both directions in Tipton County - Between SR-59 HASTINGS WAY RT. & SR-59 MUELLER BRASS RD. LT. / ALONG SR-59 FOR 0.86 MILES and SR-54 (E. LIBERTY ST.) RT. & LT. / BEGIN HOPE ST., bridge replacement construction will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.
|
|
|
State Route 224 both directions in McNairy County - Between SR-142 HWY.142 RT. & LT. and LEAVE SR-15 RT., bridge replacement construction will cause temporary lane closures every day. This work is expected to be completed by 10/15/2013.
|
|
|
State Route 3(US-51) northbound in Tipton County - Between SR-178 (TIPTON RD.) LT. and SR-206 (MUNFORD-ATKOA AV.) RT. & LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 8/15/2013.
|
|
|
State Route 188 both directions in Gibson and Crockett Counties - Between SR-54 (HWY.54) RT. & LT. / (BEGIN CROCKETT MILLS RD.) and (Mile Marker: ), bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.
|
|
|
State Route 188 both directions in Gibson and Crockett Counties - Between SR-54 (HWY.54) RT. & LT. / (BEGIN CROCKETT MILLS RD.) and (Mile Marker: ), bridge replacement construction will close the roadway every day. This work is expected to be completed by 10/31/2014.
|
|
|
State Route 20 both directions in Decatur County - Between HENDERSON-DECATUR COUNTY LINE and DECATUR-PERRY COUNTY LINE, striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 69 both directions in Decatur County - Between SR-202 (BROOKSIE THOMPSON RD.) LT. and I-40, striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 100 both directions in Decatur County - Between SR-69 (STATE HWY-69 S.) RT. & LT. and SR-20 (US/HWY-412 E.) RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 114 both directions in Decatur County - Between SR-69 STATE HWY-69 RT. & LT. and SR-202 (HWY.202) RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 201 both directions in Decatur County - Between HENDERSON-DECATUR COUNTY LINE and SR-202 MIDDLEBURG RD. RT. & BEACON RD. LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 202 both directions in Decatur County - Between SR-69 (HWY.69 S.) RT. & LT. and SR-20 HWY-412 W. RT. & LT., striping will result in rolling roadblocks every day. This work is expected to be completed by 05/27/2013.
|
|
|
State Route 78 both directions in Lake County - Between SR-79 LT. and SR-21 (LAKE DR.) RT. & (CHURCH ST.) LT., construction work will cause temporary lane closures every day. This work is expected to be completed by 6/30/2013.
|
|
|
Interstate 240 both directions in Shelby County - Between I-55 RT. & LT. / CENTER OF OVERHEAD / ALONG I-55 & RAMP SYSTEM / LEAVE I-55 BACK / CENTER OF UNDERPASS and EXIT 17: MT. MORIAH RD., resurfacing work will result in lane closures at night. This work is expected to be completed by 8/31/2013.
|
|
|
State Route 43(US-45E) both directions in Gibson County - Between SR-152 JOE LUCKEY SR. HWY. RT. & LT. and SR-105 BROECK CUMMINGS HWY. RT. & LT., striping will result in rolling roadblocks on weekdays. This work is expected to be completed by 9/30/2013.
|
|
|
State Route 78 both directions in Dyer County - Between SR-104 (W. MCGAUGHEY ST.) RT. & (FOREST ST.) LT. and SR-182 (LENOX-NAUVOO RD.) LT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 9/30/2013.
|
|
|
State Route 1 both directions in Benton County - Between SR-391 (OLD HWY-70 W.) LT. and SR-69 (HWY-641 S.) RT. & LT., bridge repair will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 10/31/2013.
|
|
|
State Route 22 both directions in Obion County - Between LEAVE SR-5 W. MAIN ST. RT. and LEAVE SR-5 W. MAIN ST. RT., resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 6/12/2013.
|
|
|
State Route 22 both directions in Weakley County - Between SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY} and SR-216 (US/HWY-45E) EB. LNS. RT. / {RT. LNS. ONLY}, resurfacing work will cause temporary lane closures every day. This work is expected to be completed by 6/12/2013.
|
|
|
State Route 194 both directions in Fayette County - Between SR-57 RT. & LT. / (BEGIN MAIN ST. / IN ROSSVILLE) (Mile Marker: 0.0) and SR-59 (HWY.59) RT. & LT. (Mile Marker: 23.0), shoulder work will cause temporary lane closures today from 8:00AM, 05/20/2013 to 3:00PM, 05/20/2013 (Central Time Zone).
|
|
|
State Route 14 both directions in Shelby County - Between SR-204 (NEW COVINGTON PK.) RT. & (SGT. WALTER K. SINGLETON PKWY.) LT. and UNDERPASS [79SR0140072]: SR-385 (PAUL W. BARRET MEMORIAL PKWY.) EB. LNS., bridge repair will cause a reduction in lanes from two to one lane this weekend. This work is expected to be completed by 6/30/2013.
|
|
|
State Route 3 (US51)both directions in Tipton County - from Hope Street (LM18.78)left and right to the Hatchie River Bridge (LM22.08)left and right.The resurfacing work will cause a reduction in lanes from two to one lane every day. This work is expected to be completed by 7/31/2013.
|
|
|
State Route 19 both directions in Haywood County - Between SR-180 (FORKED DEER RD.) LT. (Mile Marker: 2.1) and SR-1 HWY. 70 E. RT. & BROWNSVILLE BYPASS FRONT (Mile Marker: 12.3), striping will result in rolling roadblocks this weekend. This work is expected to be completed by 05/19/2013.
|
|
|
Interstate 40 both directions in Madison County - Between HAYWOOD-MADISON COUNTY LINE / BEGIN INTERSTATE-40 and MILE MARKER 79 (Mile Marker: 79.0), construction work will cause temporary lane closures at night. This work is expected to be completed by 05/22/2013.
|
|
|
Interstate 40 both directions in Shelby County - Between MILE MARKER 12 (Mile Marker: 12) and MILE MARKER 23 (Mile Marker: 23), striping will result in rolling roadblocks at night. This work is expected to be completed by 05/23/2013.
|
|
|
State Route 128 both directions in Hardin County - Between HIMA ROAD (Mile Marker: 9.77) and HIGGINS DRIVE (Mile Marker: 10.28), drainage work will cause temporary lane closures today from 7:00AM, 05/20/2013 to 3:00PM, 05/20/2013 (Central Time Zone).
|
|
|
State Route 224 both directions in McNairy County - Between SR-22 (HWY.22) RT. & LT. / (BEGIN MICHIE-PEBBLE HILL RD. / IN MICHIE) (Mile Marker: 0.0) and SR-57 (HWY.57) RT. & LT. (Mile Marker: 1.0), shoulder work will cause temporary lane closures today from 8:00AM, 05/20/2013 to 3:00PM, 05/20/2013 (Central Time Zone).
|
|
|
State Route 69 both directions in Henry County - Between SR-218 (STATE HWY-218 BYPASS) RT. & LT. (Mile Marker: 0.75) and SR-69 (MEMORIAL DR.) FRONT & (US/HWY-641 S.) LT. (Mile Marker: 1.81), drainage work will cause temporary lane closures today from 8:00AM, 05/20/2013 to 12:00PM, 05/20/2013 (Central Time Zone).
|
|
|
State Route 5 both directions in Gibson County - Between SR-366 (JAMES A. HADLEY SR. HWY.) RT. 90 DEG. LT. TURN and PICK-UP SR-76 (22ND AV.) RT. / {BEGIN US-45W/70A/79BR}, resurfacing work will cause temporary lane closures on weekdays. This work is expected to be completed by 07/31/2013.
|
|
|
State Route 424 both directions in Carroll County - Between SR-22 LEXINGTON-CLARKSBURG HWY. RT. & CLARKSBURG-HUNTINGDON HWY. LT. and SR-114 (HESTER-CAVIA RD.) RT. & (YUMA-WESTPORT RD.) LT., bridge replacement construction will result in lane closures every day. This work is expected to be completed by 05/31/2014.
|
|
|
State Route 77 both directions in Dyer County - Between SR-3 (HWY-51) RT. & LT. and SR-3 (HWY-51) RT. & LT., intersection modification work will cause temporary lane closures every day. This work is expected to be completed by 7/31/2013.
|
|